Client: Public Building Commission of Chicago
Year: 2009
Location 2200 N. Central Ave Chicago IL 60639

This project was performed to remediate the site for the
building of a new Chicago Public School.

  • Removal of 18,000 Tons of Soil (Special Urban Waste)
  • Backfill with Clean Fill
  • Compaction of Clean Fill
  • Building Footprint Preparation
  • Installation of Water Retention System
  • Installation of Sewer
  • Installation of Water Supply to the Building and to Private Hydrants
  • Installation of Irrigation System
  • Installation of Landscaping
  • Installation of Parking Lot to be used by the School and the Stadium.
  • Installation of Signage
  • Construction Fencing with Wind Screening
  • Silt and Erosion Control
  • LEED Project